FLNP JINR - JSC "NIKIET" joint workshop
09-29-2026 11:15 Конференц-зал ЛНФ (3-й этаж)
Agenda:
1. Report of NIKIET JSC "Development of a new pulsed neutron source. Interim results". Discussion of the report.
2. Report of NIKIET JSC "Current status of work under the contracts "Analysis of instability in the operation of the IBR-2M reactor" and "Preparation of initial data, development of a list and scenarios of initial events for the analysis of design basis accidents at IBR-2M". Discussion of reports and work plans for 2026-2027.